01. The SCINDIA SCHOOL (GWALIOR)
PROBLEMS DIAGNOSED
  1. FEASIBILITY OF HT LINE.
  2. ELIMINATION OF MISUSE.
  3. VOLTAGE FLUCTUATIONS
  4. COMPUTATION OF LOAD.
  5. REGULAR PANELITY ON BILLING.
  6. ISOLATION OF NON PRIORTY AREA
  7. MAINTENANCE

SOLUTIONS SUGGESTED
  1. APFC PANEL OF 75 KVaR FOR EXISTING HT LINES.
  2. 10 KVA SCOTT CONNECTED 3P TO 1 P DELTA STAR TRANSFORMERS.
  3. DEPUTING OF PROFESSIONAL ELCTRICAL ENGINEERING COMPANY.
  4. PURCHASE & SYNCRONIZING OF DIESEL GENERATOR.
02. M/s OM LOGISTICS LIMITED (NEW DELHI)
PROBLEMS DIAGNOSED
  1. FEASIBILITY OF HT LINE.
  2. ELIMINATION OF MISUSE.
  3. VOLTAGE FLUCTUATIONS
  4. COMPUTATION OF LOAD.
  5. REGULAR PANELITY ON BILLING.
  6. ISOLATION OF NON PRIORTY AREA
  7. LINE LOSSES & MAINTENANCE

SOLUTIONS SUGGESTED

  1. SUGGESTED N.D. LIP 11KV HT CONNECTION OR
  2. 50 KVA SCOTT CONNECTED 3P TO 3 P DELTA STAR TRANSFORMERS.
  3. DEPUTING OF PROFESSIONAL ELCTRICAL ENGINEERING COMPANY.
  4. CORRECTION OF ALL NEUTRAL OCTOPUSS.
  5. REPLACEMENT OF 20 KVaR CAPACITOR OF I FLOOR.
  6. SOUND PROOFING OF GENERATORS OR GENERATOR ROOM.
  7. PROPER VENTILATION AND CLEANING OF METER, PANEL, GENERATOR & UPS ROOMS
03. M/s JAIN JEWELLERS (HISSAR)
PROBLEMS DIAGNOSED
  1. METER PANELS ARE UNDRESSED WITH OCTOPUS CONNECTIONS.
  2. CONTINOUS BURNING OF SPOTLIGHTS.
  3. REGULAR VOLTAGE FLUCTUATIONS
  4. COMPUTATION OF LOAD.
  5. EARTH LEAKAGE AT MANY PLACES.
  6. ISOLATION OF NON PRIORTY AREA
  7. LINE LOSSES & MAINTENANCE
SOLUTIONS SUGGESTED
  1. ALL METER PANELS SHOULD BE DRESSED PROPERLY.
  2. ALL SPOTLIGHT BULBS SHOULD BE PROVIDED PROPER VENTILATIONS
  3. POWER FACTOR CAPACITORS SHOULD BE INSTALLED.
  4. INVERTER SHOULD BE INSTALLED PROPERLY
  5. LOAD SHOULD BE CONNECTED PROPERLY ON METERS. (DETAILS IN FEASEBILITY REPORT)
  6. IF POSSIBLE BY LOCAL ELECTRICIAN REMOVE THE LEAKAGE IN NEUTRAL TO EARTH OR BUY ISOLATION TRANSFORMER.
  7. ALL MCBS SHOULD BE REPLACED SOS.
  8. RCCB SHOULD BE INSTALLED IMMEDIATELY.

04. WELHAM BOYS' SCHOOL (DEHRADUN)
PROBLEMS DIAGNOSED
  1. CONTINEOUS HIGH VOLTAGE
  2. ELIMINATION OF MISUSE.
  3. VOLTAGE FLUCTUATIONS
  4. DRY RUN SOUND FROM TRANSFORMERS.
  5. POOR POWER FACTOR
  6. COMPUTATION OF LOAD.
  7. BILLING REVIEW.
  8. MAINTENANCE

SOLUTIONS SUGGESTED
  1. PROPER OIL TOP UP IN BOTH THE TRANSFORMERS.
  2. SERVO STABILIZERS OR NEW TRANSFORMERS EQUIPED WITH AUTO- MANUAL TAP CHANGERS.
  3. AUTOMATIC POWER FACTOR CORRECTION PANEL.
  4. REGULAR MAINTENANCE OF LOGBOOK.
  5. QUARTERLY BILLING REVIEW.
  6. CORRECTION OF ALL NEUTRAL OCTOPUS LOOPS.
  7. METRES & INDICATORS OF ALL PANELS ARE DEFECTIVE AND NEEDS TO BE REPLACED.
  8. ALL HOUSES SHOULD BE PROTECTED THROUGH MCB (PREFERABLY ELCB).
  9. PROPER TOOLS SHOULD BE PROVIDED TO MAINTENANCE STAFF AS PER LIST ENCLOSED.
  10. COMPLETE ATTENTION AND INTEREST SHOULD BE TAKEN BY THE MAINTENANCE STAFF AT THE TIME OF REPAIR OR AUDIT.

    Copyright 2006, Intellitech Home | About us | Services | Achievements | Case History | Contact us | Feedback